Skip To Main Content

School News

District News

 

ANNOUNCING OUR NEXT AND

FINAL EVENT OF THE SCHOOL YEAR

 

Health Impacts of Vaping and Secondhand Vape on

Lungs • Brain • Heart • Skin • Reproductivity • Bones

Thursday, May 2

7:00 pm to 8:00 pm

Stevens Memorial Library

Event is FREE

Register at www.NAParentResourceNetwork.org

(event is limited to 20 people)

Presentation and discussion led by

Adolis Ramos, RT, BS, Program Manager

Greater Lawrence Family Health Center

 

 

Read More about PRN Event - Health Impacts of Vaping
  • Community Engagement

 

Welcome to the Kittredge Elementary School Building Project FAQ! 

Please visit the project website here:

https://link.northandoverma.gov/KES

Frequently Asked Questions

  1. Why do we need a new elementary school building? 

Kittredge Elementary School was originally constructed in 1949, the total square footage of the building totals approximately 32,434 square feet. Four pod modular classroom buildings were attached in 2010, and a prefabricated gymnasium building was erected in 2013. 

The mechanical, plumbing, and electrical systems have been renovated over the years, but the original components are beyond their useful life and are beginning to fail. Some of the mechanical systems that need replacing include the steam boilers and the entire steam system, and the condensing gas fired boilers. The existing plumbing systems and fixtures do not meet current building codes and are not ADA compliant. The electrical lighting systems need to be replaced, including the emergency lighting and fire alarm systems. Security and technology upgrades throughout the entire school are needed as well.  

The dated envelope of the building is also in poor condition, resulting in excessive energy consumption. The roof needs to be completely replaced, and there are masonry cracks and damaged brick on the façade. All exterior doors and windows need exterior sealant replacements.  

The existing building is not handicap accessible and does not meet current accessibility codes. Entrances are in need of handicap accessibility upgrades. Vertical lifts or ramps need to be added at the lobby to the upper classroom area, and elevators need to be installed. 

The entire building is outdated and does not support an educational model that meets the needs of today’s students. A new elementary school will provide a healthy and modern learning environment that will allow both students and staff to thrive. 

Please view the entire FAQ  document here:  English   Spanish   Portuguese 

 

Read More about Kittredge School Project Frequently Asked Questions